Case Studies

Real Problems. Real Results.

Each project below is a real engineering challenge — with a documented problem, findings, and outcome. Each card links to a highlights summary; the full engineering report is available as a PDF download.

Case Study 1
Medical EquipmentMechanical Failure Analysis

$25,000 Annual Failure Cost Eliminated Through Smarter Material Selection

Cast aluminum inserts kept breaking under normal tightening loads. We traced the root cause, evaluated material alternatives, and recommended a fix that had the potential to eliminate a five-figure annual expense.

$25,000+

Annual Cost Saved

2.4×

Strength Increase

21 in-lbs

Failure Load

Case Study 2
Manufacturing / Conveyor SystemsProduction Capacity Validation

Conveyor Production Capacity Validated — Maximum Throughput Confirmed Before Costly Overdesign

A facility needed to increase production but didn't know if the largest off-the-shelf chain tensioner could handle the load. We translated production variables into an engineering load case, ran FEA, and confirmed a 2.0 safety factor at the target rate.

2.0×

Min. Safety Factor

180 lbf

Tensioner Load

2 parts/sec

Production Rate

Case Study 3
Manufacturing / AutomationGripper Design Validation

$33,300 in Trial-and-Error Costs Avoided — Pneumatic Gripper Design Validated Before Hardware Was Ordered

A pneumatic gripper was proposed for a new assembly line application using preferred ABS plastic components. No engineering data confirmed whether the design could handle the loads or what air pressure was safe. FEA revealed geometry — not just material — was the limiting constraint, and a redesigned aluminum gripper arm was validated before a single component was ordered.

$33,300

Trial-and-Error Cost Avoided

30–35 psig

Recommended Pressure

85 psig

Max Validated Limit